Surf Center unveils 100% Brazilian wave pool technology
Curitiba will be home to the world’s first heated and indoor wave pool. The Surf Center technology is 100 percent Brazilian and will open in the second half of 2024.
Curitiba, the capital of the southern Brazilian state of Paraná, is more than 100 kilometers away from the coastline.
But after a lot of technological exploration, brothers Luiz Pexe and Vilson Balioli have finally realized a longtime dream alongside a group of like-minded specialists in project development, engineering, and business professionals.